| Environmental Site Development
|
|
Birchwood Trails - Fort McMurray, AB
|
|
Up to 19km of trail system rehabilitation and installation. Removal of existing mulch trail system and re-stabilization of river bank trails complete with Class 3 gravel trail construction. Locating clearing and installing for new class 3 trails.
|
King Street - Spruce Grove, AB
|
|
Common excavation and grading to expose the existing clay grade and repair existing site erosion c/w temporary creek re-alignment additional drainage modifications and swale implementation c/w placement of Class 1 and Class 2 Rip Rap w/ geotextile...
|
Outfall 17 - St. Albert, AB
|
|
Sedimentation control structure, clay grade compaction, steel pipe piling stabilization techniques, concrete control chambers...
|
Riel Wetlands - St. Albert, AB
|
|
Working in environmentally sensetive areas, sedimentation controls, excavation of wetland soils along the Sturgeon River to create fish habitat...
|
HWY 63 Seeding - Fort McMurray, AB
|
|
Geotextile , Coconut Matting and Other Erosion Controls c/w Hydro-seeding parallel Highway 63
|
Anthony Henday - Ft. Saskatchewan River Crossing - Edmonton, AB
|
 |
Wildlife transportation corridor and riverbank restoration of over 55,000 trees, shrubs and aquatic plants....
|
|
| |
|
|