Common Wealth Stadium
Artificial Turf Installation, Civil Works 2010
Edmonton, AB
- Undergoing a complete overhaul from natural grass to artificial turf
- All civil work completed by Wilco in 4 week timeline
- Turf installation scheduled for April 15, 2010
- FieldTurf final completion scheduled for a May 2010 re-opening
| Contract Date: |
March 15th, 2010 |
Owner: |
City of Edmonton / Edmonton Eskimos
Clark Builders
|
| Superintendent: |
Ken Kuntz/Karl Nikiforuk |
Owner Contact: |
Natalie Wehner - Clark Builders
780 - 395-3393
Eugene Gyorfi - City of Edmonton
|
| Project Manager: |
Art Maat |
Consultant: |
Athletica |
| Subcontractors: |
Field Turf Tarkett - Direct with Owner
Abacus Trucking LTD.
|
Consultant Contact: |
Doug Wournell
604-299-3005
|
| Description: |
Replacemnt of natural grass with artificial turf at Commonwealth Staduim |
Key Challenges: |
Limited access to and inside work site. Working 24/7 to complete on schedule. Preserving existing site features and structures. |
| Item |
Scope of Work |
| Survey and Layout |
- In house GPS survey crew and equipment
|
| Subgrade Preparation |
- Sub base compaction as preparation for drainage layer and artificial turf
|
| Bottom Ash Base |
- Hauling, placement and compaction of 12,000m3 of bottom ash
|
| Course |
- Grading of bottom ash to a tolerance of 8mm in 20 m.
|
| Drainage |
- Supply and installation of Boss 1000 and Multiflow subgrade drainage network and tie in to existing manholes.
- Supply and installation of (2) 1200mm dia catch basin / manhole structures.
|
| Artificial Turf Field |
- 11 000m2 artificial turf Duraspine field c/w markings for football and soccer
|