|
|
| Infrastructure
|
|
Eagle Ridge Interchange - Fort McMurray, AB
|
|
5.5 HA of seeding and turf areas adjacent all four quadrants of the newly developed Eagle Ridge Interchange. Coconut Matting and Rip Rap swales utilized to control water flow and erosion...
|
Hamptons School Site - Edmonton, AB
|
|
School park site development including extensive drainage servicing, rough grading of sub-soils, fine grading of topsoil and establishment of seed for 12 sportsfields, plant material installation and site furniture.
|
Lac La Biche Subdivision Development - Lac La Biche, AB
|
|
Lac La Biche new subdivision development site servicing, roadworks, concrete walk curb and gutter forming in preparation for private lot sales...
|
LRT-35 111 St. Retaining Wall - Edmonton, AB
|
|
4,300 m2 of mechanically stabilized retaining wall system / sound wall with block patterning c/w engineered geo textile supports, poured in place concrete footings and over 2000 lm of ornamental fencing on top of concrete parapet and earth berms...
|
Yellow Head 156 St Interchange - Edmonton, AB
|
|
Over 61,000 trees, shrubs, aquatic plants installed. EcoBlanket on ditch slopes, Filtrex Filter Soxx on top and bottom of bed edges. 154,000 m2 of planting bed construction, 10,000 m2 of street blvd, 164,000 m2 of tilling grading and soil ammendment...
|
Anthony Henday Ft. Saskatchewan River Crossing - Edmonton, AB
|
 |
Wildlife transportation corridor and riverbank restoration of over 55,000 trees, shrubs and aquatic plants....
|
Whitemud Drive 199 Street - Edmonton, AB
|
|
Mass planting of over 1385 trees and 21,000 m2 of shrubs and mulch bed for the City of Edmonton in 2005 with over 7 ha of grading and seed preparation and establishment...
|
|
| |
|
|