Contract Date: |
2006-2008 |
Owner: |
City of Edmonton |
|
Superintendent: |
Mike Horner / Karl Nikiforuk |
Contact: |
Barry Luopa, Parks
|
|
Project Manager: |
Jeremy Williams |
Consultant: |
City of Edmonton |
|
Subcontractors: |
Duragaurd Fence Ltd.
The Rain Man Irrigation & Plumbing |
|
|
|
Description: |
2-Soccer goal mouth areas with synthetic turf xp sport c/w bottom ash drainage sportsfitments, 3 base ball diamonds, players benches and expanded parking... |
Key Challenges: |
Tough year for moisture, difficult growing conditions for seeded fields and common areas |
Item
|
Scope of Work
|
|
Artificial Sports Field Surfacing and Subdrainage Networks |
-
2 Soccer goal mouth areas with Synthetic Turf XP Sport Synthetic Turf c/w
-
Bottom ash drainage layer and dry well drain system
|
|
Sports Fitments – Goals |
-
Soccer Goals, Baseball Backstops, Players Benches
|
|
Concrete Forming |
|
|
Aggregates - Install Base Courses |
-
Gravel parking lot (5,900 m2) c/w precast parking curbs
-
Shale ball diamond infields
|
|
Rough Grading |
-
Site Grading (16 Ha) cut / fill
-
Trucking surplus materials on and off-site
Swale construction
|
Subgrade Preparation /
Stabilization
|
-
Subgrade Preparation as required (5,900m2)
|
Topsoil Stripping and Stockpiling,
and Grading
|
-
Topsoil removal stockpiling and placement at final grade (16 Ha)
|
|
Mechanical Seeding / Sodding |
-
Seeding of Turf Areas (16 Ha)
|
|
Irrigation Systems |
-
Irrigation Systems for Sports Fields c/w quick couplers, water box, meter chamber
|
|
Trees Shrubs and Ground Covers |
-
Mass planting installed as specified (650 trees)
|
|
Manholes Catch Basins |
-
Manholes and Catch Basin installations (4) with storm services as required
|