| Contract Date: |
Summer 2005 |
Owner: |
City of Edmonton |
| |
|
Consultant: |
Stantec Consulting Ltd. |
| Subcontractors: |
Field Turf Inc. |
|
|
Item |
Scope of Work |
| Artificial Sports Field Surfacing and Subdrainage Networks |
- Football Field (10,684m2) with Artificial Turf System on Bottom Ash Base Drainage Tile system c/w
- Weeping tile drainage line 200mm / 300mm c/w Drainage rock (700 lm)
|
| Fencing Systems and Gates |
- 4' Chain Link Fencing and Gates
- 6' Subdivision Wood Screen Fencing
|
| Site Sport Fitments – Furnishings Removals |
- Long Jump pit removals, Shot-put ring removals, existing goal post removals
- Mondo track removal
|
| Sports Fitments |
- Re-use existing Sports Goal Fitments
- Install Polymeric Nailing Strip
|
| Fencing Systems and Gates |
- 4’ Chain Link Fencing and Gates inset in concrete sidewalk
|
| Aggregates - Install Base Courses |
- Sports Field Bottom Ash base (12,750m2)
|
| Rough Grading |
- Stripping and hauling to disposal (10,500 m2)
- Stripping and stockpiling for reuse (7,500 m2)
|
Topsoil Stripping and Stockpiling, and Grading |
- Topsoil removal stockpiling and placement at final grade (7,500 m2)
|
| Mechanical Seeding / Sodding |
- Seeding of Turf Areas or Sodding as required
|
| Concrete Forming |
- Concrete Walks, Curbs, Gutters, Concrete Piles
|
| Manholes Catch Basins |
- Manholes installations (4) as required
|
| CCTV Service Inspections |
- CCTV Service Inspections on storm lines as applicable
|
| Electrical Systems |
- GE Lighting Systems re-align and re-lamp 80 existing luminaires
|
| Operating Maintenance Manual |
- Manual containing operational, product data, cleaning and maintenance information on specified products and pieces of equipment
|