| Contract Date: |
October 31, 2008 |
Owner: |
City of Edmonton |
| Superintendent: |
Ken Kuntz / Karl Nikiforuk |
Contact: |
Minnan Liu minnan.liu@edmonton.ca |
| Project Manager: |
Jeremy Williams |
Consultant: |
Stantec Consulting Ltd. |
| Subcontractors: |
MR Electric Cyber Tech Winalta Paving |
Contact: |
Dave Krywiak dave.krywiak@stantec.com |
| Description: |
Large Urban Park site and Open Space Park Facility, Dual Functioning as a SWMF for flash flooding as well as for a school ground track and field / soccer and baseball pitch facility c/w concrete amphitheater and asphalt walkways |
Key Challenges: |
Specialized drainage layer below a specialized topsoil mix was utilized preventing any heavy equipment use for mass grading efforts. All equipment used was low weight track equipment to prevent damage to sub level drainage systems. |
Item |
Scope of Work |
| Subdrainage Networks |
- 1,570 lm of drainage trench and piping
- 20,850 m2 drainage layer
- Survey and layout by GPS survey
|
| Subgrade Preparation |
- Supplying composite topsoil sand mix 250mm depth on drainage layer
- Gravel trail sub-base / Asphalt trail sub-base
- 2,475 m2 250mm depth crushed shale on drainage layer
|
| Concrete Forming |
- Construction of 3 reinforced concrete inlet outlet structures w/ steel grating and man access
- 21 lm of concrete seating
|
| Electrical Systems |
- Supply and Installation of submersible low pressure transducer
- Construction of monitoring station control cabinet with electrical components
- Setup and implementation of monitoring station to City’s SCADA system
- Remove and relocate existing power, Shaw Cable, Shaw Fibre, and Telus phone services
|
| Sports Fitments - Goals |
- Baseball Backstops, Soccer Goals, Players Benches, T-Bollards c/w piles, running track, long jump pits / take off boards.
|
| Site Fitments - Furnishings |
- Benches, Picnic Tables, Litter Containers, Bicycle Racks, T-Bollards c/w piles
- Boulders Set in Concrete / Boulder Placement Throughout Turf Areas
|
| Site Servicing |
- Installation of four (4) manhole’s 1500mm – 2400mm Dia.
- Installation of 20.6m of 900mm Dia. storm sewer
- Installation of 63.3m of 1200mm Dia. storm sewer
- SCADA system Power Supply
- Remove and Relocate Existing Water service
|
| Finished Landscaping |
- 27,550 m2 of sod / 2,265 wet and dry meadow seed
- Tree and Shrub Beds w/ mulch
|