Previous Back to Recreational Site Development Next
|
Contract Date: |
2005/2006/2009 |
Owner: |
Regional Municipality of Wood Buffalo |
|
Superintendent: |
Claude Gagne |
Contact: |
Ken Ball, Parks and Recreation
|
|
Project Manager: |
Claire St. Aubin / Jeremy Williams |
Consultant: |
ISL Engineering and Land Services Ltd. |
|
Subcontractors: |
Stuve Electrical Contractors Ltd.
The Rain Man Irrigation and
Plumbing Ltd.
H. Wilson Industries Ltd.
|
Contact: |
Randy Heaps, Landscape Architect
|
|
Description: |
Official Class 1 Certified and Irrigated Slow Pitch Fields c/w walking trails open space, and state-of-the-art play structures. From nothing but marshland to a premier playing facility, a decade in the making. |
Key Challenges: |
Electrical Coordination, Marshland Stability Issues. Numerous Contracts and coordination. |
Item
|
Scope of Work
|
|
Sports Field Turf and Subdrainage Networks |
-
8 Fields Total: 3 Standard Soccer Fields, 1 Championship Soccer Field, 2 Championship Slo-pitch Diamonds, 1 Championship Baseball Diamond, 1 Cricket Pitch
-
Sports Field Root Zone Mix and Axis Soil Amendment
|
|
Outdoor Rink |
-
Maple Leaf Gold Dasher Board System
|
|
Site Fitments – Furnishings |
-
Benches, Picnic Tables, Litter Containers, Bicycle Racks, T-Bollards c/w piles
|
|
Sports Fitments – Goals |
-
Soccer Goals, Foul Poles, Home and Pitchers Plate, Elevated Bleachers, Players Benches
|
|
Asphalt Paving |
-
Outdoor Rink and Park Trail System (21,000m2)
|
|
Site Fitments - Furnishings |
-
Benches, Picnic Tables, Litter Containers, Bicycle Racks, T-Bollards c/w piles
-
Boulders Set in Concrete / Boulder Placement Throughout Turf Areas
|
|
Asphalt Paving |
-
Asphalt Trail Paving and Line Marking
|
|
Concrete Forming |
-
Concrete Curbs, Concrete Piles
|
|
Electrical Systems |
-
Parking Lot and Trail Lights (31)
-
Musco Sports Field Lighting System (20) – Galvanized poles c/w luminaresupply and assembly (60’-70’ Ht.).
-
Musco Main distribution equipment
|
|
Aggregates - Install Base Courses |
-
Asphalt Paving Base (21,000 m2)
-
Field perimeter base work (9,000 m2)
|
|
Rough Grading |
-
Site Clearing, Grubbing and Grading (75,000 m2)
-
Trucking surplus materials on and off-site
|
|
Subgrade Preparation |
-
Subgrade Preparation over site c/w stabilization in areas as required
|
Topsoil Stripping and Stockpiling,
and Grading
|
-
Topsoil removal stockpiling screening and placement at final grade (20,000 m2)
|
|
Mechanical Seeding / Sodding |
-
Seeding of Turf Areas or Sodding as required
|
|
Irrigation Systems |
-
Irrigation System for Turf Fields c/w quick couplers
|
|
Playground |
-
Playground and Surfacing installation
|
|
Fencing Systems and Gates |
-
4’ Chain Link Fencing and Gate
-
Post and Rail Fencing
|
|
Trees Shrubs and Ground Covers |
-
Mass planting installed as specified
|
|
Site Services- Distribution Piping, Fittings and Tie Ins |
-
Extensive underground service installation, water (230 lm), sanitary (400 lm), storm sewer (247 lm) connection tie into existing systems c/w base aggregates and compaction testing. Coordination and trenching for franchised utilities
|
|
Manholes Catch Basins |
-
Manhole and Catch Basin installation (4) with sanitary and storm services as required
|
|
Safety |
-
Maintaining a secure construction site in a public setting including public signage indicating alternative trail routes
|