Contract Date: |
June 2008 |
Owner: |
City of Edmonton
Asset Management & Public Works
|
|
Superintendant: |
Mike Horner |
Contact: |
Barry Luopa |
|
Project Manager: |
Jeremy Williams |
Consultant: |
N/A
|
|
Subcontractors: |
Duraguard Fencing Inc. |
Contact: |
N/A |
|
Description: |
School site development including drainage servicing, rough grading of sub-soils, fine grading of topsoil and establishment of seed for 5 sports fields |
Key Challenges: |
Establishing the seed |
Item
|
Scope of Work
|
|
GPS Survey and Layout |
-
Leica GPS equipment
-
CADD, Terra model, Pay Dirt software
|
|
Rough Grading |
-
Sub-soil site grading of 7.2 hectares approximately 27,000m3
-
Grading to varying depths of 50mm, 150mm and 200mm below finished grade
-
Swale, berm and field topography
|
|
Fine Grading |
-
Fine grading of topsoil depths 150mm - 200mm to tolerance of 15mm
|
|
Drainage / Underground Servicing |
-
Underground service installation, storm sewer 375mm dia. (58 lm)
-
Connection tie in to existing systems c/w base aggregates
-
2ea. 1200mm dia. storm sewer and catch basin manholes
|
|
Sport Fitments / Structures |
-
2ea. construction of baseball diamonds including red shale warning track, canopy chainlink backstop, home plates and players benches
-
Supply and installation of 1 ea. 6ft x 10ft soccer goals, 2 ea. 8ft x 24ft soccer goals
|
|
Fencing |
-
Installation and maintenance of temporary 1.8m high paige wire fence
|
|
Seed Establishment |
-
7.2 ha mechanical seed installation
-
Dedication of full time labour to manually water the entire site to ensure seed germination
|
|
Tree Planting |
-
384 ea. ornamental caliper trees
|