Previous Back to Urban Landscapes Next
|
Contract Date: |
2008-2011 |
Owner: |
Surebrook Developments Ltd. |
|
Superintendant: |
Claude Gagne |
Contact: |
Jodie Wacko, Director Land Development |
|
Project Manager: |
Jeremy Williams |
Consultant: |
IBI Group |
|
Subcontractors: |
-
Ripley Construction
-
Raiders Concrete
-
Whyte Tiger Trucking
-
AIM Asphalt Services
|
Contact: |
Cathryn ChopoBeck, Associate |
|
Description: |
Subdivision infrastructure landscaping, site grading, storm water management systems, subdivision fencing, asphalt walkways, granular perimeter trails and clearing, concrete swales and decorative slabs, soccer sports fields, open and public park spaces, and all site furnishings. |
Key Challenges: |
Maintaining a safe ongoing construction site in an active residential setting throught this large development. |
Item
|
Scope of Work
|
|
Subgrade and Preparation |
-
Excavation and disposal of existing clay
-
Minor grading and levelling
-
Installation of 100mm - 450mm depth of topsoil
-
Shrub bed excavation
-
Over 100,000m3 marginal material screened and utilized on-site or placed and hauled off-site
|
|
Mechanical Seeding / Sodding |
-
Seeding and sodding as required
|
|
Trees, Shrubs and Ground Covers |
-
Mass plantings installed as specified
-
Installation if 75mm depth of wood mulch
-
Installation of 300mm depth cobblestone mulch
-
Installation of boulder
|
|
Site Maintenance
|
-
Landscape maintenance for park spaces and boulevards
-
Establish and maintain seeded and sodded as well as other areas for 2 year period, from CCC to FAC
|
|
Site Furnishings |
-
Bench, picnic table, garbage receptacle, and large steel structure installation
|
|
Concrete Forming |
-
Concrete curbs, concrete pads, decorative concrete nodes
|
|
Site Services - SWMF |
-
Underground service installation including landscape fabric, storm water management catchment system, natural boulder baffles, and preimeter riprap
|
|
Park Amenities and Sports Field |
-
Soccer field and open park space grading & preparation, seeding and sodding, c/w site fitments
-
Over 1000lm of asphalt trail systems
-
3.5km granular perimeter trail along the top of the valleys banks, c/w rest nodes, benches and receptacles
|
|
Safety |
-
Maintaining a safe construction site in a public setting including public signage indicating alternative routes
|